• WhatsApp:+86-18303261131
  • CONTACT US
    • HQ:Xinhua Park,Economic Development Zone,Cangzhou City,Hebei Province,China.
    • Tel: +86-317-3051805
    • Fax: +86-317-3051835
    • WhatsApp:+971-564395756
    • Emailinfo@fdpetrol.com
    • Russia Moscow Office
    • +791-53053973
    • UAE Dubai Office:
    • +971-564395756
    You are here: HOME > Case Study > Waste Management

    Xinjiang Oilfield Drill Waste Management Project

     Xinjiang Oilfield OBM Drilling Waste Management Project

    The SGL-01 cuttings dryer manufactured by FD Petrol was in operation in Xinjiang oil drilling company, from 23th,November 2011 to 9 th, December 2011, totally 17days 85 hours. During this period, the well depths was drilled from 2890m to 3520m.Rock physical character is argillaceous sandstone, oil based drilling fluids is adopted. 

    This system has got efficient performance on drilling cuttings drying, after treatment the oil on cuttings(by weight) dropped from 15.6% to 3.78%,successfully recovered 71.5m³drilling fluids. The lost of drilling fluids is saved, the environment is protected, the expense on treating the drilling waste is minimized.  

     Xinjiang

    FD Petrol Drilling Waste Management & Solids Control & Rig Camp