• WhatsApp:+86-18303261131
  • CONTACT US
    • HQ:Xinhua Park,Economic Development Zone,Cangzhou City,Hebei Province,China.
    • Tel: +86-317-3051805
    • Fax: +86-317-3051835
    • WhatsApp:+971-564395756
    • Emailinfo@fdpetrol.com
    • Russia Moscow Office
    • +791-53053973
    • UAE Dubai Office:
    • +971-564395756
    You are here: HOME > Case Study > Waste Management

    PetroChina GWDC Drilling Waste Management Project

    Great wall drilling companyOBM Drilling Waste Management Project

    FD Petrol cuttngs dryer system was in operation in CNPC Great Wall Drilling Company OBM drilling waste management project , from 12th,March 2012 to 30 th ,March 2012, totally 19days 72 hours. During this period, the well depths was drilled from 3054m to 3568m.Rock physical character is argillaceous sandstone, oil based drilling fluids is adopted.

    FD Petrol cuttings dryer system has got efficient performance on drilling cuttings drying, after treatment the oil on cuttings (by weight) dropped from 16.7% to 4.32%, successfully recovered 68m³drilling fluids. The lost of drilling fluids is saved, the environment is protected, the expense on treating the drilling waste is minimized  
    CNPC-GWDC CNPC-GWD

     

    FD Petrol Drilling Waste Management & Solids Control & Rig Camp